• jetA
    link
    fedilink
    English
    arrow-up
    3
    arrow-down
    1
    ·
    6 months ago

    100% agreed. If they had been serious about this whole we’re going to bring supplies in from the sea. Day 1 through 30 should have been amphibious vehicles. Day 30 through 60 should have been pier-based vehicles, and 60 plus should be showing massive high throughput. With UN peacekeepers at some point to prevent bombing of the aid caravans.